multi-unit
energy-efficient
new-construction
Project Type
Multi-Unit Residential
Technology
BC Energy Step Code 5 Hybrid ICF / concrete forming Reusable prefab forming panels
Five Step 5-rated duplexes in Squamish, ICF and concrete construction, and private yards — setting a new benchmark for sustainable mountain housing.
Energy-efficient mountain living in Squamish's Sea-to-Sky Corridor
Brief
Challenge
Steep terrain, blasting
Major blasting required to develop a steep, constrained site with almost no flat ground to stage equipment or materials.
Solution
Crane logistics and prefab forming on a constrained site
Reusable prefab forming panels were lifted and repositioned by crane — an efficient approach where conventional staging wasn't possible. Hybrid ICF and traditional forming delivered the durable exposed concrete finish throughout all five units.




Results
Five duplexes at the top of BC's energy standard
Step Code 5 certified with exposed concrete ICF construction and private outdoor spaces
Credits
Every project is a collaboration — built on the expertise of the trades and consultants who show up and do the work.











